Public buildings are the ones that must open after the storm. Offices, shops, stations and depots serve people when conditions are worst, and a roof that fails in a blizzard fails the public. In an average year Flagstaff, AZ gets 90 to 97 inches of snow, and after the 2023 storm both the city and the county issued structural warnings. Facilities directors who run mixed portfolios on fixed budgets need a short list. It names the roofs that matter most, checks load and drains, keeps a record that survives an audit and writes scopes that bid cleanly.
Public work needs paper. We supply it.
By March 2, 2023, the storm that arrived on February 28 had left 24.5 inches of snow in some areas. Several roofs failed, officials said, and they listed sagging ceilings, bowing trusses and severe leaks as what owners should watch for. The City of Flagstaff and Coconino County also share an information line for structural roof concerns.
Public owners should put that guidance to work. Train staff on the signs. Post the number. Walk the roofs before the first storm and after each big one. We give each building a card and a priority number, so the highest-risk roofs get checked first. Our snow and ice damage review follows every big storm and goes into the building file with photos and dates.
Snow records help planning. A single day of 35.9 inches fell on February 21, 2019, four years before the 2023 storm. Heavy snow returns to Flagstaff often enough that a public owner should plan for the load every year and not only after a bad winter. The inventory keeps those dates beside each roof, so a future review can tell what each roof has already carried.
Public portfolios cross departments. City hall, fire stations, shops, libraries, recreation centers and storage yards all have roofs. We list every roof section with its department, age, system, drains and condition. We note who maintains it and which budget line pays.
That list removes a common delay. A leak report that bounces between offices wastes days. With one list, the facilities director sees every roof together and can set priorities across departments. The inventory sorts sections into replace, repair and watch groups, each with a cost range and a date. Downtown also holds the Railroad Addition Historic District, listed on the National Register in 1983, and any owner of an older building there should ask what review steps apply before roof work starts. A government building roof is rated on the same scale as any other, with extra notes where review steps apply.
Records are kept with the building, not with a person. Facilities staff change jobs, departments reorganize and budgets move. A dated file with photographs, section numbers and costs survives those changes. We deliver it in a form that anyone in the agency can open and update, and we review it with the facilities director each year.
North of Flagstaff, the 2022 Pipeline Fire burned 26,532 acres and the Tunnel Fire 19,088, and monsoon storms then brought flash flooding to the burned ground. In the city's account, the Pipeline Fire left new flood risk in the Schultz Creek watershed, with neighborhoods along Highway 180 exposed. That is ground drainage, not roof drainage, but it changes the cost of any water that reaches a building.
Public owners with buildings in Doney Park, along Highway 180 or in Fort Valley should check that roof drains and downspouts discharge well away from walls. Clean drains and clear gutters keep roof water from adding to ground water. We check the discharge point on every drain, extend downspouts where needed and note any grade that slopes toward a building. Roughly a third of the 20 to 22 inches of annual precipitation falls in the July and August monsoon, which is when a clogged downspout shows itself.
Procurement rules govern public work. Each bid, quote and approval step has its own dollar threshold. A scope that is clear clears them sooner. Scopes are written by section and carry quantities, materials, attachment, flashing details, edge metal, warranty terms and phasing. Every bidder prices the same document.
The scope names the code basis. Flagstaff's adopted codes are the 2018 building and energy codes and the 2017 electrical code, with local changes made in 2019 under City Code Title 4. Replacement follows that edition and those amendments. Insulation, wind and fire details get confirmed with the building official ahead of pricing. Bidders start from the same baseline when a roof condition report comes first. The report also backs the agency up if conditions are challenged afterward.
Contractors who coordinate with the agency need the roof facts as well. A general contractor running a renovation can take the roof section of the scope and fit it to the project schedule. We give both sides the same document, with sequence and hold points, so the roof does not become the delay.
The public still walks into these buildings during reroofing. The plan for occupied building reroofing moves one section at a time. Quiet hours, protected entries and one open area at a time are written into the plan. We tell the facilities director in advance which part of the roof is open, and we close every section at day's end.
Emergency repairs are possible at any hour. When a leak reaches a records room or a dispatch center, the water is stopped first, then equipment is covered and the cause documented. The finished repair follows in the next dry window. Adhesives and sealants will not cure properly in the cold, so permanent work waits for milder months while winter patches are logged as temporary. With freezing back by late September and a record low of minus 30 degrees F, large projects belong in spring and summer.
Call before the first heavy storm. Hand over the building list, roof types and last walk dates. Sag checks and drain checks come next, followed by the inventory and the ranked list. Auditors, council budget hearings and insurers all draw on the same file.
Agencies with several kinds of buildings can use one format. The approach also fits school districts, which share procurement steps and fixed calendars, and it covers military-style sites such as a National Guard armory, where access rules decide the schedule. A facilities director who keeps the file current can answer a council question in minutes. That is worth more than any one repair.
Empty the room, then dial our number and the city and county structural line. There is no reason to wait for water. Staff stay out until the structure has been checked and the space made safe.
Dated inspection reports, repair photos and a drain log are the record. Auditors and insurers ask for those. The file arrives in a form you can store and pass on.
Yes. Every building has its own section list, and totals roll up by department and year. A facilities director can pull up one building or the whole portfolio.
They change ground drainage more than roofs. Keep drains clear, extend downspouts away from walls and check grade near buildings on the north side.
A year ahead. Bids and approvals take months, and permanent work fits spring through early fall. Winter repairs are temporary.
Browse the services, roof systems and building types we work with across Flagstaff and nearby Arizona communities.
A walk of the roof with photos, findings and a written scope.
Active leaks, storm damage and blocked drains get a fast response.
Roofing across Flagstaff and nearby Arizona communities.